The Company
CRUXAR S.R.L. specializes in Automation of Industrial Process and Machinery
Our main objectives are:
- Increase our costumers’ productivity.
- Maximize the quality of their final product.
- Improve their workers’ safety
CRUXAR is formed by Technicians and Engineers specialized in Industrial Control and Automation, who have worked in the field for more than 10 years.
The proposed solutions are based on the ultimate technology developed by the leading technology companies.
Architecures
CRUXAR human resources have developed and implemented different industrial automation solutions in environments with the following characteristics:
SIEMENS
-
Interface:
Simatic PCS7
WinCC
Central Archive Server (CAS)
Historian
Panel OP
-
Batch Processing:
Simatic PCS7 Batch
-
Controllers:
S7 Serie 400
S7 Serie 300
S7 Serie 200
-
Field Networks:
ProfiNet.
Profibus DP.
Profibus PA Analogical Signal Treatment networks.
ASi Digital Signal Treatment networks.
ROCKWELL
-
Interface:
FactoryTalk View SE
FactoryTalk View ME
RS View 32
Panel View
-
Batch Processing:
FactoryTalk Batch.
-
Management System:
FactoryTalk Vantage Point.
Metrics.
-
Controllers
Serie ControLogix 55XX / L6X / L7X.
Serie SLC 500.
Serie PLC 5.
-
Field Networks:
ControlNet.
DeviceNet.
Ethernet.
FlexIO.
ABB
-
Interface:
Industrial IT System 800xA.
-
Batch Processing:
Industrial IT System 800xA Batch Management.
-
Controllers:
Serie AC400.
Serie AC800.
-
Field Networks:
S800 I/O.
Profibus DP / PA / ASi. Adaptations.
GE
-
Interface:
Fix32
Fix Dinamics.
Proficy iFix.
Proficy Historian.
-
Batch Processing:
Proficy Batch Execution.
SCHNEIDER
-
Controllers:
Serie Modicon TSX Micro.
Serie Premium.
(Read +)
Experience
Our professional work team has excelled in important projects such as.
Control System Migration and Expansion.
Cervecería y Maltería Quilmes - Zarate Plant, Buenos Aires, Argentina.
The Siemens PCS7 system (Batch) that has been implemented processes 14.000 input - output signals of the plant.
Project Execution Time: 6 years (3 years for migration and 3 years for expansion).
Control System Migration and Expansion.
CERVEPAR - Ypane Plant, Paraguay.
-
The Siemens PCS7 system (Batch), that has been implemented, processes 11.000 input - output signals of the plant.
Project Execution Time: 5 years (3 years for migration and 2 years for expansion).
Control System Migration and Expansion.
Cervecería CCA - Asunción Plant, Paraguay
The Siemens PCS7 system (Batch) that has been implemented processes 2.000 input - output signals of the plant.
Project Execution Time: 6 months.
Control System – Brew house.
AMBEV – Sete Lagoas Plant, Minas Gerais, Brazil.
The Rockwell (ControLogix) / GE (iFIX - Batch) System that has been implemented processes 1.500 input -output signals of the Plant.
Project Execution Time: 6 months.
Emergency Matrix System – Dew Point Adjustment Plant.
CHEVRON – Las Bases Plant, Rio Negro, Argentina.
Schneider Modicon Premium System.
Project Execution Time: 4 months.
Control System and Emergency Matrix – Oil Stabilization Plant.
CHEVRON – Campo Bremen Plant, Rio Gallegos, Argentina.
Rockwell (ControLogix) / GE (iFIX) System.
Project Execution Time: 6 months
Control System Migration.
Cervecería y Maltería Quilmes - Mendoza Plant, Mendoza, Argentina.
ABB Industrial IT System.
Project Execution Time: 6 months.
Fermentation Cellar Expansion.
Heineken – Araracuara Plant, San Pablo, Brazil.
ABB Industrial IT System.
Project Execution Time: 4months.
Control System– Simple Syrup and Final Product Plant for Soda Production.
Cervecería y Maltería Quilmes -Zarate Plant, Buenos Aires, Argentina.
Siemens PCS7 System.
Project Execution Time: 4months.